Abstract:The gold mining in Jiaodong area has a long history. In the 1970s and 1990s, a large number of goafs with poor stability have been formed. In the process of the goaf treatment, the grouting method is generally used for the top filling to eliminate the hidden danger of the ground collapse. In this paper, setting the historical and abandoned goaf treatment project of the abandoned silver and gold mine in Wendeng city as an example, pointing to present condition of poor groundwater resources in the treatment area, the medium coarse sand scheme is selected for the first time, and the sand injection is carried out by using the combination of dry injection method and the water injection method. Thus, the purpose has been gained for eliminating the hidden dangers of geological disasters caused by goaf collapse and forming a new water storage space.