Abstract:Jining iron deposit in Shandong province is buried in metamorphic rocks of Jining group. The iron ore resources are about 1.834 billion tons. Because the buried depth is below 1000m, and the mining condition is bad, in order to identify hydrogeological condition, hydrogeological exploration drilling holes with the depth of 1500m have been constructed. On these basis, pumping test has been carried out, and hydrogeological parameters have been gained. Through numerical simulation, it is predicated that normal mine water inflows at the depth of 1200m,1300m,1400m,1500m are 998.56m3/d, 1079.27m3/d, 1159.98m3/d, 1240.68m3/d respectively. It will provide hydrogeological data for feasibility study of mining.