Abstract:Through second and third seismic exploration method, combining with the forword numerical simulation and wave impedance inverson, structures of B1 coal strata in No.3 coal well in Dajing coal mine of Zhundong coal field in Xinjiang have been predicated, bifurcation and combination scope of B1 coal strata has been primarily explained quantitatively, and the range of 0.8~2.0m thickness of gangue in B1 coal strata has been accurately forecasted. After drilling verification, it is regarded that this method is feasible with high precision. It will provide accurate seismical geologica data for coal mine.