Abstract:Water inrush accident is one of the major hazards in safety production of coal mines. It will not only cause life threaten, but also will bring huge economic loss. Main shaft of Maozhuang coal mine will pass through flowing sand stratum with rich water resource, and gunite impervious reinforcement should be carried out. In this paper, general construction situation, design and construction method of high pressure jet grouting impervious reinforcement in main shaft in Maozhuang coal mine have been introduced. It will provide some references for relative study and production work.