Abstract:Pointing to problems occurred in drilling construction in thick unconsolidated layers, such as hole walls collapse, fall block, reducing diameter which will cause burying drilling, sticking drilling, can not find the original holes and form forked drilling holes. Countermeasures and precautions for safe construction in thick unconsolidated layers have been introduced briefly.