Study on Third Party Monitoring in Urban Rail Traffic Engineering——Setting Qingdao Metro Construction as an Example
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    第三方监测作为一种先进的管理模式,在国内地铁建设中得到广泛应用。青岛地铁穿越地层为上软下硬的土岩组合地层结构,在地铁第三方监测实施过程中有别于其他城市。依托青岛地铁一期工程第三方监测工作实践,介绍了第三方监测的目的、任务、流程,对青岛地铁第三方监测实施过程中存在的若干问题进行了探讨,并提出了相应的想法和建议。

    Abstract:

    Third party monitoring is an advanced management mode. It has been widely used in subway construction in China. Qingdao subway cross the strata with combination structure as soft in upper part and hard in lower part. It is different with other cities in third party monitoring in subway construction. Based on practices of third party monitoring in the construction of Qingdao Metro Line 1, purpose, task and process of third party monitoring have been introduced in this paper. Problems occurred in third party monitoring in the construction of Qingdao Metro works has been discussed, and some optimization thoughts and suggestions have been put forward as well.

    参考文献
    相似文献
    引证文献
引用本文

谢远成.城市轨道交通工程第三方监测模式探讨[J].山东国土资源,2013,29(8):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: 2013-11-29