Abstract:Ocean current power plant is generally constructed in the regions with deep water, high current rate and complex hydrological condition. Based on practical experiences of Rongcheng current power plant engineering drilling, offshore drilling technology has been introduced in this paper, including drilling platform, drilling equipment selection and drilling equipment installation. The technique problems, such as drilling platform positioning, tubular installing, height measurement and drilling core have been discussed in detail. On the basis of analyzing engineering drilling technologies and methods under complex sea region conditions, a set of economical, applicable, convenient and safe methods have been summarized and analyzed.