Abstract:Through survey on hydrogeological conditions of talc mine in Qixia city and analysis on disasters caused by water inrush in middle part of 200m working face of No.63 line well, basic characteristics and origin of mine water inrush disasters have been comprehensively studied. On these basis, countermeasures for preventing mine water inrush have been put forward.