Abstract:According to DOM and DEM datas of the second land survey in Shandong province, using the principle of epipolar colinearity equation, the large scene 3D stereo model were generated. Then choosing the best paths of overhead transmission line, measuring plane and cross sections, crossing field datas acquisition, profile datas accurate fitting, and 3D roaming and so on. The measured 4D standard datas will be applied in the whole process of overhead transmission engineering surveying and designing. Based on factural application, applying methods and attention matters during the operation are put forward as well.