Occurrence Rule and Water Sprouting Amount of Limestone Water in Lower Part of the Tenth Layer in the 12th Mining Area in Guozhuang Coal Mine of Tengzhou City
Water sprouting amount of mining area is the basis for designing drainage system. Precision of water yield will influce the safety of coal exploitation in mining area directly. Water sprouting rule and supply condition of the lower part of the 10th lime