东平湖二级湖堤波浪爬高探讨
DOI:
作者:
作者单位:

作者简介:

通讯作者:

基金项目:


Study on Wave Climbing of Secondary Lake Bank in Dongping Lake
Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    东平湖老湖设计防洪水位为46.0m,2001年、2003年汛期,老湖水位只有44.38m,43.2m,遭遇了较大的风浪,波浪已接近二级湖堤堤顶,出现了较大的险情,为分析出险原因,对二级湖堤的波浪因素进行了分析研究。通过有关理论分析和实际验证,1993年二级湖堤加高设计时,堤顶超高、石护坡波浪要素计算采用前苏联西晓夫公式,不符合老湖的实际情况,而现行规范推荐的莆田试验站公式更适合老湖波浪实际情况。采用莆田试验站公式计算,二级湖堤现状高度不足,欠高值为0.57~1.34m;部分堤段石护坡厚度不足,厚度差1~7cm。

    Abstract:

    Flood preventing level of old Dongping lake is 46.0m. Water level of old lake is only 44.38m and 43.2m seperately in flood season of 2001 and 2003 year. Wave have nearly reached the top of bank, and large danger condition happened. Through study on related theory analysis and factual experience, it is proved that by using Н·В·щищов formula, calculation result of superelevation of levee crown and slope element for preventing wave can not fit the factual condition of old lake, while Putian formula is comparat...

    参考文献
    相似文献
    引证文献
引用本文

高峰,李振,陈志江,梅玉泉.东平湖二级湖堤波浪爬高探讨[J].山东国土资源,2005,(11):

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
历史
  • 收稿日期:
  • 最后修改日期:
  • 录用日期:
  • 在线发布日期: