Dongping lake is an important engineer for parting and blending flood in lower reach of the Yellow river. Its secondary dam is the boundary, which can divide flood-blending areas of Dongping lake into new and old areas. They can be used in secondary degree. According to change of new lake condition and function of old lake area, it is showed that preventing degree of secondary dam is not conformity with present condition and plan of Dongping lake, which should be determined anew. It should be promoted from ...