Abstract:Shandong Aluminum Corporation is going to construct a red-mud-heap field which just located at a limestone ming-up pit in muzhushan mountain. If there were not seepage prevention measures to be taken, the field s operation would contaminate the down-stream underground water bodies, which can result in the water PH-value rising to 11 3. Therefor the padding layer for seepage-prevention has been suggested to be used, which is composed of red-mud and quick lime with a ratio of 1 to 9. According to the charac...